| SPECIAL
FEATURES |
Year constructed: 2006
Lot 212 (2.8 million pesos)
- (Exclusive strategic location on National Highway, with 20 meters of building frontage. Also vehicle traffic averages 9000 to 12000 vehicles passing by location per day.)
Building (3.4 million pesos)
- (Building prepared for two or three story construction in the future, includes Filshutters brand roll up doors, and side entrance from concreted barangay road. First class American construction throughout, too many extras to list. Dumaguete City engineers building occupancy permit included.)
Interior renovation (1.1 million pesos)
- (Includes all preparations for restaurant, plumbing, electrical, and general, and specific construction to specifications of the franchise.)
Chinky's Franchise - optional (1.5 million pesos)
- (Includes all staffing, outside signage, outside and interior murals, menuboard, all appliances, and many extras such as cash register, safe deposit vault, display case, et. Also exclusive right to Negros Oriental.)
Generator (210,000 pesos)
- (Japanese 10 Kva Denyo brand,silent type,newly rebuilt Kubota diesel engine, new injectors, boost pump, oil change with japan filter, new radiator hoses and coolant change, separate wiring three phase split into separate panel boards, fully balanced, and resting on a custom built steel frame which is insulated from building.)
Transformer (96,000 pesos)
- (American Cooper brand 23 Kva includes wiring, insulators, lightening arrestor etc.)
- 30 years service life of unit.
Tables (63,000 pesos)
- (Imported Malaysian with gliders 21 pieces)
Chairs (66,500 pesos)
- (Imported Malaysian with gliders 70 pieces)
Air conditioning (291,000 pesos)
- Japanese Daiken brand 3 HP inverter type, 50% savings on electrical bill each month, 3 units total.)
Sidewalk, 20 meter span (105,000 pesos)
- (D.P.W.H. sidewalk demolished and reconstructed to specification, for purpose of vehicle passage onto lot, resulting in the finest parking lot in all of Dumaguete City.)
10% profit, overhead supervision and engineering
Total: P10.4 million pesos
|